Manufacturing Infrastructure

Our Workshop & Plant Facilities

Located on Dehradun Road, Saharanpur, our modern engineering works combines heavy lifting capacity, automated cutting, certified welding, and precision machining.

Saharanpur Plant Works

Engineered for Heavy Manufacturing

The New Super Engineering Works plant is purpose-built to fabricate heavy infrastructure components with high safety margins. Our multi-bay facility ensures parallel workflows for structural cutting, fit-up, continuous welding, and machining without logistical bottlenecks.

Plant Address & Location:

Plot no. 368, Paragna Harora, Dehradun Road, Kailashpur, Saharanpur - 247001 (Uttar Pradesh), India

Main Plant Floor
Heavy Structural Fabrication Bays
Facility Bay 01

Heavy Structural Fabrication Bays

Spacious, high-clearance manufacturing bays engineered to accommodate oversized plate girders, bridge spans, and wide-radius tunnel gantries.

Key Infrastructure Capabilities:

  • Overhead EOT cranes for safe material transport and roll-over
  • Submerged Arc Welding (SAW) stations and semi-automatic MIG sets
  • Heavy-duty level layout beds for precision dimensional squaring
Precision Machine Shop Floor
Facility Bay 02

Precision Machine Shop Floor

Dedicated mechanical engineering facility equipped for heavy turning, shaft step-machining, boring, keyways, and structural pin fabrications.

Key Infrastructure Capabilities:

  • Extended bed heavy-duty lathes for long shaft turning
  • Vertical and horizontal boring machines for structural weldments
  • Precision micrometers and dimensional verification tools
Plate Processing, Cutting & Bending Bay
Facility Bay 03

Plate Processing, Cutting & Bending Bay

High-tonnage metal forming and profiling division handling carbon and alloy steel plates across varying industrial thicknesses.

Key Infrastructure Capabilities:

  • Multi-torch CNC oxy-fuel profile flame cutting lines
  • Heavy hydraulic press brakes for channel and angle forming
  • Precision mechanical edge beveling for full-penetration weld prep
Trial Mock-Up & Pre-Dispatch Yard
Facility Bay 04

Trial Mock-Up & Pre-Dispatch Yard

Dedicated assembly yard where segmented tunnel gantries and multi-span structures undergo full physical trial assembly prior to delivery.

Key Infrastructure Capabilities:

  • Hydraulic pressure testing of cylinders and power packs
  • Dimensional check certificates and bolt hole alignment verification
  • Surface blasting and high-build industrial protective coating